EPV-5000-OY

Home / Winches /
EPV-5000-OY
Force 5000 kg
Cable storage 130 m
Power 7,0 kW
Line speed 8 Mtr/min

Electrical cable handling winch

  • 5.000 kg on layer 3
  • 0-8 mtr/min on layer 3
  • Drum ø355 x 740 mm
  • Cable capacity 130 mtr. ø32mm in 4 layers + 3 safety windings
  • 400V 50Hz 3ph
  • IP56 TENV
  • T5-L2-M5 (according FEM 1.001 en ISO 4301/1)
  • 150% WLL failsafe brake
  • Surface treatment 3- layer C5M coating + zinc-nickel alloy
  • Usertemperture -10° tot +40° Celsius
  • Including options:
    standstill heating motor
    Cover over motor and drum
    Cornerblocks in frame for easy connection
    Forklift pockets in frame WIth U-beam for guiding and protection
    Spooling device max angle 0-35°
    Wind logo cutted in frame or protection guard.
    Lashing points
    Lifting points
  • Frequency control Stainless steel 316 box
    Protection class IP66
    Operation temp -10°C – +40°C
    Control type Frequency
    Supply voltage 380-440V 50-60Hz 3-Phase without 0
    Connection power supply Plug on cord
    Cables 5m power supply cable 63A
    20m PUR between control pendant and control cabinet
    Operation Belly box- Actual force readout
    – Harsh environmental proof  buttons and joysticks
    – Main switch
    – Overload protection
    – PTC
    – Brake resistor
    – Brake control
    – Standstill heating cabinet
    Position controlbox On winch

DROMEC winches. Your movement in good hands.

Dynamic and Innovative in winches, winchsystems, controls and software. With our enthousiastic team, we develop  from small till  very big & complex systems with the highest demands in terms of safety and ease of use. We also work very closely with certified body’s as DNVGL, BV, ABS, Lloyds so your winches and systems can be completely certified at our own company together with you.

It often starts with a good idea, preferably on a piece of scrap paper. After an initial consultation, we prepare one or more proposals, including a target price and preliminary drawing. Your idea or problem, always remains central in this. If the feeling on both sides is good, we start. Thanks to our own inhouse developed and written project software, your project stays in the picture and under control from start to finish, including the planning and delivery time. We are LloydsRegister ISO 9001 certified.